# Fresh paint does not make a Roswell lot compliant. The measurement does.

Pavement markings, accessible stalls, access aisles, fire lane work and a written layout record for commercial property inside the City of Roswell and across north Fulton.

## What does a Roswell property risk when its lot is repainted without being measured?

A repaint carries the existing geometry forward, including whatever is wrong with it. The Americans with Disabilities Act places the obligation on the entity that owns or operates the facility, so an accessible stall that measures short, an access aisle that delivery drivers park across because nobody hatched it, and an accessible route that runs behind parked cars all stay with the property and its tenants after the striping crew has loaded up and gone. The contractor who reapplied the lines is not the party a complaint names.

Most striping bids on a Holcomb Bridge Road center price a line count and a mobilization. A line count is a promise to reproduce what is already on the ground, and a property that buys one has paid to refresh a defect and to restart the clock on anybody noticing it. Thrare Contracting measures the lot against the 2010 ADA Standards for Accessible Design before pricing, so the proposal states which stalls hold the standard, which are correctable by layout alone, and which need paving or civil work that no striping scope covers.

Roswell lots reach a striping crew from six directions, and the reason matters because it decides how much of the layout is genuinely open for change.

- **A paving cycle.** A seal coat, a mill and overlay, or a full reconstruction erases every marking, which makes it the cheapest moment in a decade to correct an accessible count.
- **A property condition assessment.** A sale or a refinance puts a third party consultant on the asphalt with a tape measure, and accessible parking is a standard line item in that report.
- **A demand letter or a complaint.** A property that has received one needs a measured record of the lot as it stands, which a repaint does not produce.
- **A fire marshal note.** Fire lane curbing and legends get written up at inspection, and the inspection names the property rather than the vendor.
- **A tenant change.** Parking counts sit inside lease exhibits, and a suite converting to a medical, outpatient therapy or daycare use changes both the demand and the accessible ratio that applies.
- **An equipment installation.** An electric vehicle charging island, a dumpster enclosure or a generator pad removes stalls from the total, and the accessible minimum is calculated off the total.

## How many accessible spaces does a Roswell lot owe, and is the count taken per site or per lot?

Section 208.2 of the 2010 ADA Standards for Accessible Design takes the count from the number of spaces in each parking facility rather than from the property total. Section 208.2 states that "Where more than one parking facility is provided on a site, the number of accessible spaces provided on the site shall be calculated according to the number of spaces required for each parking facility", and the advisory to that section explains the word choice: "The term 'parking facility' is used Section 208.2 instead of the term 'parking lot' so that it is clear that both parking lots and parking structures are required to comply with this section." A Crossville Road property with a 180 space customer lot and a separate 40 space employee lot behind the building runs the table twice and owes 6 spaces in one and 2 in the other.

Van spaces come out of that number rather than being added to it. Section 208.2.4 requires that "For every six or fraction of six parking spaces required by 208.2 to comply with 502, at least one shall be a van parking space complying with 502." The arithmetic below applies Table 208.2 and section 208.2.4 to lot sizes common in Roswell, and every figure in it is a minimum that a local code, a state requirement, an insurer or a franchise standard is free to exceed.

| Spaces in that one lot | Accessible spaces owed | Van spaces within that number |
| --- | --- | --- |
| 18 | 1 | 1 |
| 44 | 2 | 1 |
| 88 | 4 | 1 |
| 140 | 5 | 1 |
| 210 | 7 | 2 |
| 320 | 8 | 2 |
| 600 | 12, at 2 percent of the total | 2 |

Apartment and condominium communities along Alpharetta Highway and Old Alabama Road answer to a second rule as well. Section 208.2.3.2 covers resident parking beyond one space per unit and requires that "2 percent, but no fewer than one space, of all the parking spaces not covered by 208.2.3.1 shall comply with 502." Guest and employee parking at that same community returns to Table 208.2. A community that ran its entire lot through one rule has almost certainly produced the wrong number.

Placement is a requirement, not a convenience. Section 208.3.1 puts accessible spaces "on the shortest accessible route from parking to an entrance complying with 206.4", and disperses them among accessible entrances where a building has more than one. Grouping every accessible stall at the end of the lot where the paint went on easiest is a location defect that fresh paint cannot repair.

Two exceptions in section 216.5 remove the identification sign rather than the space. Exception 1 applies "Where a total of four or fewer parking spaces, including accessible parking spaces, are provided on a site", and Exception 2 applies "In residential facilities, where parking spaces are assigned to specific residential dwelling units". Neither exception reduces a count and neither one relaxes a dimension.

## Which measurements decide whether a Roswell accessible stall passes?

Every dimension a striping crew has any control over is written down in section 502 of the 2010 ADA Standards, and each one is checkable on a Saturday morning by anybody holding a tape and a level. None of the figures below involve an opinion.

- **Stall width, section 502.2.** Car spaces are 96 inches wide minimum and van spaces are 132 inches wide minimum, with an exception permitting a van space at 96 inches minimum where its access aisle is 96 inches wide minimum. The two van layouts trade width between the stall and the aisle and both reach 192 inches across the pair.
- **Where the tape reads, section 502.1.** Width "measurements of parking spaces and access aisles shall be made from the centerline of the markings." With a 4 inch line, a stall that reads 100 inches outside edge to outside edge is a 96 inch stall under the standard, and a stall that reads 96 inches outside edge to outside edge is 4 inches short. That single detail accounts for a large share of the accessible stalls that fail a measured audit.
- **Access aisle, sections 502.3 through 502.3.2.** Aisles are 60 inches wide minimum, extend "the full length of the parking spaces they serve", and two spaces are permitted to share one aisle, which is what a paired accessible stall layout is doing.
- **Aisle marking, section 502.3.3.** The standard requires only that access aisles "shall be marked so as to discourage parking in them", and its advisory states that the method and color are not specified by the requirements. Hatch color is a local or agency question rather than a federal one.
- **Aisle position, section 502.3.4.** Access aisles "shall not overlap the vehicular way", and angled van spaces "shall have access aisles located on the passenger side of the parking spaces."
- **Slope, section 502.4.** Changes in level are not permitted, with one exception: "Slopes not steeper than 1:48 shall be permitted." A 1:48 slope is 2.08 percent, it applies in every direction across the stall and its aisle, and paint does not change a grade.
- **Vertical clearance, section 502.5.** A minimum of 98 inches has to be held over a van space, over its aisle, and along every vehicle route reaching it. Canopies, deck beams and drive-through clearance bars are what this requirement finds.
- **Signage, section 502.6.** Van space signs carry the designation "van accessible", and a sign sits "60 inches (1525 mm) minimum above the finish floor or ground" measured to the bottom edge of the sign.
- **Overhang, section 502.7.** Parked vehicles "cannot obstruct the required clear width of adjacent accessible routes", which is the job a wheel stop or a deeper stall does.

Slope is the measurement that ends a paint conversation and starts a paving one. A Roswell lot that has been overlaid twice can exceed 2.08 percent at the accessible stalls, because each overlay follows the grade underneath it and thickens toward the crown. Thrare Contracting records a slope reading at every accessible stall and reports the stalls that fail, rather than laying a compliant looking rectangle onto ground that is not.

## Does the federal MUTCD reach the stalls inside a Roswell shopping center lot?

No, and the exclusion is written into the regulation that adopts the manual rather than being an interpretation of it. 23 CFR 655.603(a) makes the Manual on Uniform Traffic Control Devices "the national standard for all traffic control devices installed on any street, highway, or bicycle trail open to public travel", and then states: "Parking areas, driving aisles within parking areas, and private highway-rail grade crossings are also not included in this definition."

The same paragraph is precise about what stays inside the definition, and one Roswell shopping center sits on both sides of the line at once. 23 CFR 655.603(a) counts as open to public travel "roads within shopping centers, airports, sports arenas, and other similar business and/or recreation facilities that are privately owned but where the public is allowed to travel without access restrictions." The circulation road running through a Mansell Road center is therefore inside MUTCD applicability, while the stalls and the driving aisles between them are outside it. A page that flattens that into "the MUTCD does not apply to shopping centers" has overstated the exclusion in the other direction.

Retroreflectivity is where the striping trade most reliably oversells the manual to a property manager. Section 3A.05 of the MUTCD 11th Edition, published December 2023 by the Federal Highway Administration, requires that "a method designed to maintain retroreflectivity at or above 50 mcd/m2/lx under dry conditions shall be used for longitudinal markings on roadways with speed limits of 35 mph or greater." Paragraph 5 of that same section then lists what the requirement excludes, and item D is curb markings and item E is parking space markings. So a proposal that sells a private Roswell lot re-stripe as MUTCD retroreflectivity compliance is citing a rule that reaches neither the location nor the marking type. Glass beads are still worth specifying on a dark lot with poor pole coverage, and Thrare Contracting quotes them as a night visibility decision that the property makes, never as an obligation the property is under.

What the manual does supply for a private lot is a color and symbol vocabulary drivers already read, which is worth following where no rule compels it. Section 3A.03 sets the marking colors as yellow, white, red, blue or purple, and its paragraph 6 states that "When used, blue markings shall supplement white markings for parking spaces for persons with disabilities", so blue supplements white rather than replacing it. Section 3B.22 paragraph 8 advises that the International Symbol of Accessibility pavement marking "should be placed in each parking space designated for use by persons with disabilities". Section 3B.27 requires white for on-street parking space markings, which is a street rule and not a private lot rule. Section 3B.18 paragraph 5 leaves special curb colors to local highway agencies, which is exactly why red fire lane curbing and its legend get confirmed with the Roswell Fire Department as the authority having jurisdiction instead of assumed from a neighboring county's practice.

## Which government's stormwater rules reach a lot inside the Roswell city limits?

The City of Roswell's own program reaches a lot inside the Roswell city limits, and Fulton County's stormwater program does not. Fulton County Government states the boundary in its own words: "The purpose of the Stormwater Management Program is to manage the surface water resources of unincorporated Fulton County, including administration, maintenance, operations, regulation, and enforcement. For all other areas of the County, stormwater management is the responsibility of the individual cities."

That distinction decides which document belongs in a closeout file. County guidance on exterior cleaning circulates widely in the trade and gets quoted at incorporated addresses, where it is not the governing authority. The instruction to a crew does not change, because containment is containment. The citation on the paperwork does change, and a compliance file is worth exactly as much as the citation inside it.

The City of Roswell describes its own obligation through the regional and federal programs it sits inside: "The City of Roswell is part of the 15-County Metro North Georgia Planning District (MNGWPD). As part of these requirements, along with the Clean Water Act regulation for the NPDES Phase I Permit, the City is required to undertake certain activities each year to protect our streams." Among the measures the City lists that it must manage and address are "Illicit discharge detection and elimination", "Construction site runoff control and post-construction runoff control", "Litter control", and "Drainage systems operation and maintenance".

Thrare Contracting works out of 8735 Dunwoody Pl, Ste R, Atlanta, GA 30350, and covers Roswell and the rest of north Fulton from there as a service area. Which authority governs a given lot gets checked address by address at quoting time. Inside Fulton County alone, Roswell, Alpharetta, Milton, Johns Creek, Sandy Springs and Mountain Park each administer programs of their own, and one metro-wide assumption is wrong somewhere.

## Why does the City of Roswell already bill a Roswell parking lot every month?

The City of Roswell charges a stormwater utility fee computed from impervious surface, and a parking lot is impervious surface. The City states that it "has utilized a stormwater utility fee since 2011 to finance the replacement and repair of the City's aging stormwater infrastructure", that the fee "is based on the amount of impervious surface area on each developed property in the City", and that "Commercial properties will receive a bill based on their actual impervious surface area."

The rate matters less than the formula behind it. In the City of Roswell stormwater fee table, the non-residential and commercial monthly figure as of July 1, 2024 is $5.99, and the table footnote states how that figure is applied: "Rate calculated by multiplying total amount of impervious surface times the monthly rate divided by 4,100 square feet." So $5.99 is a rate per 4,100 square feet per month rather than a flat bill. Applying the City's own formula to a 90,000 square foot impervious footprint gives roughly 22 billing units and about $131 a month, and that arithmetic is worked here from the published formula rather than quoted from a bill.

Two consequences follow for a striping decision. Re-marking a lot changes the lines and not the impervious area, so a re-stripe does not move the stormwater bill. Adding pavement does move it, which is why a charging island, an enclosure pad or a widened drive aisle belongs in the same conversation as the layout rather than in a separate one a year later.

The City also publishes the state of its own queue. Roswell employs a Drainage System Investigator whose work order list "is currently backlogged approximately 9 months". That figure describes the City's maintenance queue for its public drainage system, not permit or inspection response times, and it should not be restated as one. It is a reason to treat on-site drainage as a site problem to solve on site rather than a ticket to file and wait on.

## Where can pre-stripe wash water and marking removal residue go in Roswell?

Not into a storm drain. The City of Roswell defines the term it enforces against without qualification: "Illicit discharge is any discharge to a storm sewer that is not composed entirely of storm water." Degreasing an oil spot before paint, rinsing a surface, and grinding out an old thermoplastic line each produce material that definition captures.

Roswell has named receiving water at stake, and the City is explicit about it: "Big Creek, Hog Waller Creek, and Foe Killer Creek watersheds in the City of Roswell are listed as not supporting their designated use. Rocky Creek and Willeo Creek watersheds are partially supporting their designated use." The City attributes those listings to elevated bacteria levels influenced by urban runoff. In its public washing guidance the City states the principle in plain language, written to residents about cars: wash "in an area where water will not go directly into a storm drain and don't pour dirty wash water down the storm drain." That sentence is the City's own statement of the wash water principle rather than a commercial rule the City has issued to contractors, and it is quoted here on that basis.

Five things follow on the ground, and each one is a line a property can hold a striping contractor to.

- Surface preparation leads with dry methods. Blowers, rotary brooms and vacuum sweeping lift the grit that stops paint bonding and produce no discharge at all.
- Oil and grease spots that need a degreaser run as a contained operation, with the wash water collected instead of rinsed toward the nearest inlet.
- Thermoplastic and paint removal runs dry and captured, so the removed material leaves the property as solids.
- Storm inlets inside and downgradient of the work area are covered before anything starts and stay covered until the final sweep.
- Sweepings, grinding residue and spent material leave with the crew, and the disposal record goes into the closeout package beside the layout record.

A Roswell property manager can also see where a complaint would land: the City directs illicit discharge reports to the Department of Stormwater Management at (770) 641-3707 or swmp@roswellgov.com. This page prints no penalty amount, because the dollar figures circulating in the striping and pressure washing trade trace to secondary sources rather than to the City or to a statute, and the amount that would apply depends on the enforcement route taken.

## What hours can a striping crew work on a Roswell property?

Roswell's noise rules sit in the City Code at sections 5.1.13 and 8.8.3(s), and the City's own summary of them does not publish either the decibel thresholds or the nighttime hours. The City describes the ordinance this way: it "prohibits sounds that exceed established decibel thresholds, particularly during nighttime hours, and outlines restrictions on sources such as animals, construction, landscaping equipment, amplified music, and outdoor performances." The City also records that the ordinance "provides exemptions for certain activities, including emergency work, public safety operations, permitted events, religious services, school-related performances, and daytime construction or landscaping."

Striping is night work by nature, because a stall cannot be laid out or painted with a car sitting in it. So the hours question is real, and this page answers it by naming the code sections rather than by printing a number. No decibel limit and no quiet-hours time appear here: the City does not publish them on its summary, and the codified ordinance text sits behind a reader that did not render on 2026-09-02. For reference on currency, the Roswell Code of Ordinances is codified through Ordinance No. 2025-11-10, adopted November 10, 2025, in Supplement 17, with online content updated August 14, 2026.

What that means in practice is a sequencing decision made before the crew books the night. Blowers, rotary brooms and grinders are the loud operations on a striping job, and those get scheduled into the earlier part of the window wherever a residential property line abuts the lot. Layout, taping, stencil placement and paint application are quiet and carry the overnight hours. Where a property wants loud work late beside houses, Thrare Contracting confirms the window against the ordinance with the City before scheduling rather than finding out when a resident calls at one in the morning.

## How does Thrare Contracting sequence a Roswell re-stripe?

The order carries more weight than the equipment, because every step downstream of an unmeasured layout inherits the errors in it. Seven steps run a Roswell lot.

1. **Measure before quoting.** Stall count by lot, stall width and depth, accessible stall and aisle dimensions taken centerline to centerline, aisle length, sign presence and mounting height, and a slope reading at each accessible stall.
2. **Write the finding, stall by stall.** Each accessible stall lands in one of three categories: holds the standard, correctable by layout, or requires paving or civil work outside a striping scope.
3. **Approve the count on paper.** Changing a stall count touches lease exhibits and sometimes a zoning parking requirement, so the property signs off on the new count before any removal begins.
4. **Settle the removals.** Any line whose position changes comes off the asphalt. Painting beside an old line leaves a ghost, and under headlights a driver reads a ghost as a second stall edge.
5. **Prepare dry, cover the drains.** Every inlet in and below the work zone gets covered before a machine starts. Preparation runs on blowers, brooms and vacuum, and an oil spot needing chemistry is handled inside containment.
6. **Pull the layout off the building.** Control comes from permanent structures, never from the paint being replaced, and that single decision is what stops an old error propagating into the new lot. Painting then advances block by block so part of the asphalt stays usable.
7. **Close out with the record.** Before and after photographs, the measured layout record, the slope readings, the disposal record, and a punch list of everything found outside the striping scope.

Nowhere on this page is there a drying time or a reopening time. Air temperature, humidity and how wet the asphalt is all move that number, and the data sheet for the specific product decides it, so anything published here in advance would be a guess wearing the clothes of a specification. The expected reopening time for the product actually being used is given to the property before the crew rolls.

## What is in a Roswell striping price, and what sits outside it?

A Thrare Contracting proposal for a Roswell lot spells out both halves, since almost every dispute in this trade starts in the second one. This page carries no dollar figure at all. A striping number is produced by walking the asphalt: how many stalls, how sound the pavement, how much old marking has to come off, and how many hours the lot can be held.

### Inside the number

- Field measurement of what is on the ground now, plus the written finding that compares it to the count table and to section 502.
- Control points established off the building, with string and chalk carried through the whole lot.
- Dry preparation: blowers, brooms and vacuum sweeping across the area being painted.
- All line work in the agreed layout, single or double, together with arrows, stop bars, crosswalk bars and painted legends.
- The accessible stalls themselves: stall lines, hatched aisles, and the accessibility symbol laid in every one of them.
- Fire lane lines and curb paint, where the agreed scope calls for them.
- Inlet covers, plus the cones and barricades that hold each wet block until the paint takes traffic.
- The closeout package: photographs, the measured layout record, and a recorded slope at every accessible stall.

### Outside the number unless the proposal says otherwise

- Anything that touches the pavement itself: patching, crack filling, seal coat, overlay or reconstruction.
- Grading work where a stall or its aisle sits steeper than the 2.08 percent that section 502.4 allows.
- Hardware of any kind. Posts, sign panels, wheel stops and bollards are quoted separately, the accessible stall sign included.
- Taking out existing thermoplastic, which carries its own unit price once somebody has measured how much there is.
- Fees or approvals the City charges for work reaching the public right of way.
- Flagging or off duty officers, which only arise where the work crosses the property line into a Roswell street.
- Raising a canopy, a beam or a clearance bar that sits under the 98 inch minimum on a van route.
- Cutting back planting, limbs or a misplaced bollard that blocks an accessible route.

Findings from the measurement that no striping scope can fix are photographed and listed for the property to price separately. They are neither swallowed silently nor added to an invoice after the fact.

## What does Thrare Contracting need from a Roswell property before mobilizing?

- A stall count, split out by parking facility, or a site plan we can count from. Section 208.2 runs its table once per facility.
- One person with authority to shut down all or part of the asphalt, and an honest answer about when it empties.
- Notice to tenants and residents, issued by management early enough that vehicles leave on their own.
- Where the property ends and the City street begins, since crossing that line pulls in permitting and traffic control.
- Copies of anything already written about the lot: a complaint, a demand letter, a consent order, a fire inspection note.
- A product specification where a lender, an owner or a brand standard imposes one.
- Whether houses back onto the lot, which drives when the noisy equipment runs.

## How does the City of Roswell buy striping work?

The City of Roswell publishes its own thresholds, and a striping job lands in one of three bands depending on size. The City states that "City departments have the authority to purchase between $0 and $2,499", that "Purchases between $2,500-$74,999 are generally competed through an informal solicitation process, typically by means of requesting written quotes", and that "The City requires formal solicitations for most goods and services at $75,000, and at $25,000 for professional services." A formal solicitation "must be advertised a minimum of fourteen days or more, depending on State law", and formal solicitations are posted "to the City's Bonfire Procurement Portal and the Georgia Procurement Registry."

One detail is worth knowing before anyone reads a local advantage into a striping bid. The City's Local Vendor Preference ordinance "applies to all informal and formal procurements greater than $10,000 excluding construction projects; professional and consulting services; federally funded projects; and online/electronic sealed bid/reverse auctions." Construction is on the exclusion list. The City also states that "Vendor registration is necessary for anyone doing business with the City", and its Purchasing Division sits at 38 Hill Street, Suite 130, Roswell, GA 30075, reachable at (770) 641-3718.

These thresholds belong to the City of Roswell alone. They are not Fulton County's, not the State of Georgia's and not federal, and repeating one buyer's numbers at another buyer misstates the process a bid has to follow.

### Which certifications and registrations can a public buyer verify?

Rare Earth Ltd trades as Thrare Contracting and carries DBE, ACDBE and MBE certification. The firm meets the small disadvantaged business definition, appears in SAM under UEI Z4WKS4UE8NJ6 and CAGE code 9JAV8, and participates in E-Verify. Three things the firm does not have, and never claims: HUBZone status, 8(a) status, and a SOC 2 attestation. The only public sector past performance figure published anywhere on this site is $198,000 of recycled aggregate delivered to Fulton County Public Works, and it belongs to that one engagement rather than to a portfolio.

## Which other jurisdictions have their own lot striping page?

Local rules differ by address, so each city has a page of its own carrying only what its own government publishes. The hub below holds the method, the layout discipline and the full scope.

- [ADA parking layout hub](https://www.thrarecontracting.com/parking-lot-striping-and-ada), the method, the measurement discipline and the whole scope
- [Striping inside the City of Atlanta](https://www.thrarecontracting.com/parking-lot-striping-atlanta)
- [Striping in Marietta and Cobb County](https://www.thrarecontracting.com/parking-lot-striping-marietta), two separate ordinances at one address
- [Striping in Alpharetta](https://www.thrarecontracting.com/parking-lot-striping-alpharetta), north Fulton's other incorporated city page
- [Striping in Decatur and DeKalb County](https://www.thrarecontracting.com/parking-lot-striping-decatur)

### What else runs on the same Roswell mobilization?

- [Roswell parking lot cleaning](https://www.thrarecontracting.com/parking-lot-cleaning-roswell), the same preparation work sold on a standing interval instead of once
- [Roswell commercial pressure washing](https://www.thrarecontracting.com/commercial-pressure-washing-roswell), governed by the identical illicit discharge definition quoted above
- [Structured parking and decks](https://www.thrarecontracting.com/parking-decks-and-structured-parking), where clearance rather than stall width is the binding dimension

## Frequently asked questions

**How many accessible spaces does a 60 space Roswell lot need?**

A parking facility holding 60 spaces owes 3 accessible spaces under Table 208.2 of the 2010 ADA Standards for Accessible Design, which sets 3 for the 51 to 75 range, and at least 1 of those 3 is a van space under section 208.2.4. Every one of the 3 has to meet section 502 on width, aisle, slope and signage, so a lot with three painted symbols and one undersized aisle still falls short.

**Is the accessible count taken across a whole Roswell property or lot by lot?**

Lot by lot. Section 208.2 of the 2010 ADA Standards states that where a site has more than one parking facility, the number of accessible spaces "shall be calculated according to the number of spaces required for each parking facility", and the advisory to that section confirms the term covers parking structures as well as surface lots. A Roswell property with a 180 space front lot and a 40 space rear lot owes 6 in front and 2 in back, which is 8 in total rather than the 7 a single site-wide count would produce.

**Does the MUTCD require retroreflective glass beads on parking stall markings?**

No. 23 CFR 655.603(a) states that "Parking areas, driving aisles within parking areas, and private highway-rail grade crossings are also not included in this definition" of a facility open to public travel, so the Manual on Uniform Traffic Control Devices does not reach the stalls in a private Roswell lot. Section 3A.05 of the MUTCD 11th Edition sets 50 mcd/m2/lx for longitudinal markings on roadways posted at 35 mph or greater, and its paragraph 5 lists curb markings and parking space markings among the markings excluded from that requirement. Glass beads remain worth specifying on a poorly lit lot as a night visibility choice the property makes.

**Does Roswell or Fulton County regulate stormwater at a lot inside the city limits?**

The City of Roswell does. Fulton County Government states that its stormwater program manages "the surface water resources of unincorporated Fulton County" and that "For all other areas of the County, stormwater management is the responsibility of the individual cities." Roswell defines illicit discharge as "any discharge to a storm sewer that is not composed entirely of storm water", and directs reports to its Department of Stormwater Management at (770) 641-3707.

**Does re-striping a lot change the City of Roswell stormwater fee?**

No. The City of Roswell bases the fee on impervious surface area, stating that "Commercial properties will receive a bill based on their actual impervious surface area", and repainting markings changes neither the area nor its imperviousness. The City's fee table lists a non-residential monthly rate of $5.99 as of July 1, 2024, applied through the footnote formula "Rate calculated by multiplying total amount of impervious surface times the monthly rate divided by 4,100 square feet", so the bill scales with square footage. Pouring a new charging island, enclosure pad or drive aisle widening does add impervious area and does affect the fee.

**Is Thrare Contracting based in Roswell, and how does a City of Roswell buyer find its bids?**

Thrare Contracting operates from 8735 Dunwoody Pl, Ste R, Atlanta, GA 30350, and covers Roswell and north Fulton as a service area. City of Roswell formal solicitations are posted "to the City's Bonfire Procurement Portal and the Georgia Procurement Registry", and the City requires formal solicitation "for most goods and services at $75,000, and at $25,000 for professional services", with purchases from $2,500 to $74,999 competed informally through written quotes. Rare Earth Ltd, operating as Thrare Contracting, is certified as a DBE, an ACDBE and an MBE, qualifies as a small disadvantaged business, is registered in SAM under UEI Z4WKS4UE8NJ6 with CAGE code 9JAV8, and is enrolled in E-Verify.

## Sources

- [United States Access Board, 2010 ADA Standards for Accessible Design](https://www.access-board.gov/ada/). Sections used on this page: 208.2 with its advisory, for the count taken facility by facility; 208.2.4, for the one-in-six van ratio; 208.2.3.2, for resident parking above one space per unit; 208.3.1, for placement on the shortest accessible route; 216.5, for the two exceptions that drop an identification sign; and 502.1 through 502.7, for centerline measurement, stall and aisle width, shared aisles, hatching, aisle position, the 1:48 slope ceiling, the 98 inch clearance, sign height and vehicle overhang. Read 2026-09-03.
- [United States Access Board, Guide to the ADA Standards, Chapter 5: Parking Spaces](https://www.access-board.gov/ada/guides/chapter-5-parking/). The plain-language guide behind the same sections, used here to confirm the count table, the van ratio, the aisle at 60 inches, stall widths at 96 and 132 inches, clearance at 98 inches, and sign height measured to the bottom of the panel. Read 2026-08-31, re-read 2026-09-03.
- [23 CFR 655.603, Standards](https://www.govinfo.gov/content/pkg/CFR-2024-title23-vol1/xml/CFR-2024-title23-vol1-sec655-603.xml), U.S. Government Publishing Office. Paragraph (a) alone: what the phrase open to public travel covers, why a road through a retail center is inside it, and the sentence removing parking areas and their driving aisles from it. Read 2026-09-03.
- [Federal Highway Administration, Manual on Uniform Traffic Control Devices, 11th Edition, December 2023, Part 3, Markings](https://mutcd.fhwa.dot.gov/pdfs/11th_Edition/part3.pdf). Used here for five things: the permitted marking colors and blue as a supplement to white in 3A.03; the maintained retroreflectivity floor in 3A.05 together with the exclusions listed in its paragraph 5; curb legends and locally prescribed curb colors in 3B.18; the accessibility symbol as a pavement marking in 3B.22; and the on-street white requirement in 3B.27, which is a street rule. Read 2026-09-03.
- [Fulton County Government, Stormwater Services](https://www.fultoncountyga.gov/services/water-services/stormwater-services-fulton-industrial-district). The statement that the county program manages unincorporated Fulton County and that stormwater management in all other areas is the responsibility of the individual cities. Read 2026-09-02.
- [City of Roswell, Environmental Public Works, Stormwater Utility](https://www.roswellgov.com/government/departments-division/environmental-public-works/stormwater-utility). The utility fee in use since 2011, the impervious surface basis, commercial billing on actual impervious surface area, the listed program measures, and the Drainage System Investigator work order backlog. Read 2026-09-03.
- [City of Roswell, Finance, Utility Services, Roswell Stormwater Fees](https://www.roswellgov.com/government/departments-division/finance/utility-services/). The non-residential and commercial monthly rate of $5.99 as of July 1, 2024 and the footnote formula dividing by 4,100 square feet of impervious surface. Read 2026-09-03.
- [City of Roswell, Environmental Public Works, Watershed Protection](https://www.roswellgov.com/government/departments-division/environmental-public-works/stormwater-utility/watershed-protection/). The definition of illicit discharge, the MNGWPD and NPDES Phase I statement, the listed and partially listed watersheds, the City's washing guidance written to residents, and the stormwater reporting contact. Read 2026-09-02.
- [City of Roswell, Community Development, Nuisances](https://www.roswellgov.com/faqs/nuisances/). The noise ordinance at City Code 5.1.13 and 8.8.3(s), the restricted sources, and the exemption list including daytime construction or landscaping. The City does not publish the decibel thresholds or the nighttime hours on that page. Read 2026-09-02. Codification currency from the [Roswell Code of Ordinances on Municode](https://library.municode.com/ga/roswell/codes/code_of_ordinances), codified through Ordinance No. 2025-11-10, adopted November 10, 2025, Supplement 17, online content updated August 14, 2026. Read 2026-09-02.
- [City of Roswell, Procurement Opportunities](https://www.roswellgov.com/business/procurement-opportunities/). Department purchase authority to $2,499; informal solicitation from $2,500 to $74,999; formal solicitation at $75,000 for most goods and services and $25,000 for professional services; the minimum fourteen day advertisement; posting to the City's Bonfire Procurement Portal and the Georgia Procurement Registry; the Local Vendor Preference ordinance and its exclusion of construction projects; the Purchasing Division address and phone. Read 2026-09-03.

## Get a Roswell lot measured before it is repainted

Give us the street address, how many stalls sit in each separate lot, and which nights the asphalt can be cleared.