# A Marietta re-stripe is laid out against the ADA standard, not traced over the old paint.

Pavement markings, accessible stalls, access aisles and fire lane work for commercial property inside the Marietta city limits and across Cobb County.

## Who buys parking lot striping in Marietta, and what are they actually buying?

Property managers, asset managers, retail landlords, apartment and condominium boards, church and school facility staff, and Cobb County and City of Marietta facility departments buy lot striping, and the thing being bought is a defensible layout rather than fresh paint. Faded lines are a curb appeal complaint. An accessible stall measuring 92 inches wide, an access aisle that delivery drivers park in because nobody hatched it, or an accessible route that runs behind parked cars is a different category of exposure, because a Title III complaint under the Americans with Disabilities Act attaches to the property owner and the tenant, not to the contractor who reapplied the lines.

Most re-stripe bids on a Marietta shopping center quote a line count and a mobilization. A line count reproduces whatever layout is already on the ground, including the error, and the property has then paid to refresh a violation and to reset the clock on anybody noticing. Thrare Contracting measures the existing layout and compares it to the standard before quoting, so the proposal states which stalls comply, which do not, and what changes when the lot is re-laid.

### What usually triggers a re-stripe on a Marietta property?

- **A seal coat or a mill and overlay.** New asphalt removes every marking, so the layout is set from scratch and is the cheapest moment to correct a count.
- **An ADA demand letter or complaint.** A property that receives one needs a measured record of the lot, not a repaint.
- **A fire marshal finding.** Fire lane markings and curb painting get cited at inspection, and the citation names the property.
- **A new anchor tenant or a lease renewal.** Parking counts are written into leases, and a re-laid lot changes the count.
- **An EV charger or dumpster enclosure installation.** Removing stalls for equipment changes the total, and the accessible minimum is calculated off the total.
- **A change of use.** A suite converting to a medical or outpatient physical therapy use carries a different accessible ratio than general retail.

## How many accessible spaces does a Marietta parking lot need?

Section 208.2 of the 2010 ADA Standards for Accessible Design sets the minimum from the total number of spaces in the parking facility, beginning at 1 accessible space for a facility of 1 to 25 spaces and 2 accessible spaces for 26 to 50. Table 208.2 runs as follows, quoted from the standard published by the United States Access Board.

| Total spaces in the parking facility | Minimum required accessible spaces |
| --- | --- |
| 1 to 25 | 1 |
| 26 to 50 | 2 |
| 51 to 75 | 3 |
| 76 to 100 | 4 |
| 101 to 150 | 5 |
| 151 to 200 | 6 |
| 201 to 300 | 7 |
| 301 to 400 | 8 |
| 401 to 500 | 9 |
| 501 to 1000 | 2 percent of total |
| 1001 and over | 20, plus 1 for each 100, or fraction thereof, over 1000 |

Two details in section 208.2 decide more Marietta lots than the table does. The first is that the count is per parking facility rather than per site: section 208.2 states that "Where more than one parking facility is provided on a site, the number of accessible spaces provided on the site shall be calculated according to the number of spaces required for each parking facility." A Cobb Parkway center with a front lot of 180 spaces and a separate rear employee lot of 40 spaces owes 6 accessible spaces in front and 2 in back, not 7 across the property. The second is the van ratio in section 208.2.4: "For every six or fraction of six parking spaces required by 208.2 to comply with 502, at least one shall be a van parking space complying with 502." A lot owing 6 accessible spaces therefore owes 1 van space, and a lot owing 7 owes 2.

Apartment communities off Roswell Street, Powder Springs Street and Franklin Gateway follow a different rule again. Section 208.2.3.2 of the standard covers resident parking beyond one space per unit: "2 percent, but no fewer than one space, of all the parking spaces not covered by 208.2.3.1 shall comply with 502." Guest and employee parking at the same community goes back to Table 208.2. A community that counted its whole lot under one table has almost certainly counted it wrong.

Section 208.3.1 then places the spaces, requiring that they sit "on the shortest accessible route from parking to an entrance complying with 206.4", and where a lot serves several accessible entrances the spaces are dispersed among them. A center that grouped every accessible stall at one end because the paint was easier there has a location problem that no amount of fresh paint corrects.

These figures are federal minimums. A local code, a state statute, an insurer or a franchise standard can require more accessible spaces than Table 208.2, and none of them can require fewer.

## What dimensions must an accessible stall and its access aisle hold?

Section 502 of the 2010 ADA Standards fixes every dimension a striping crew controls, and each one is a number a property manager can verify with a tape measure on a Saturday morning.

- **Stall width.** Section 502.2 requires car parking spaces 96 inches wide minimum and van parking spaces 132 inches wide minimum. The exception permits a van space at 96 inches minimum where the access aisle is 96 inches wide minimum.
- **Aisle width and length.** Section 502.3.1 sets access aisles at 60 inches wide minimum, and section 502.3.2 requires that access aisles "shall extend the full length of the parking spaces they serve."
- **Where the tape goes.** Section 502.1 states that where spaces are marked with lines, "width measurements of parking spaces and access aisles shall be made from the centerline of the markings." With a 4 inch line, the outside edge to outside edge distance runs 4 inches wider than the centerline to centerline distance, so a stall measured outside edge to outside edge at 96 inches is a 92 inch stall under the standard.
- **Aisle marking.** Section 502.3.3 requires only that access aisles "shall be marked so as to discourage parking in them", and the advisory to that section states that the method and color of marking are not specified by the requirements. Hatching color is therefore a state, local or agency question, not a federal one.
- **Aisle location.** Section 502.3.4 states that "Access aisles shall not overlap the vehicular way", and that angled van spaces "shall have access aisles located on the passenger side of the parking spaces."
- **Slope.** Section 502.4 permits no changes in level, with one exception: "Slopes not steeper than 1:48 shall be permitted." Slope runs in all directions across the stall and its aisle.
- **Vertical clearance.** Section 502.5 requires 98 inches minimum of vertical clearance at van spaces, at their access aisles, and along the vehicular routes serving them, which is the rule that catches a canopy, a low deck beam or a drive-through clearance bar.
- **Signs.** Section 502.6 requires the International Symbol of Accessibility on the identification sign, the words "van accessible" on van space signs, and a sign mounted 60 inches minimum above the finish floor or ground measured to the bottom of the sign. Section 216.5 exception 1 removes the sign requirement only where four or fewer spaces total are provided on the whole site.
- **Overhang.** Section 502.7 requires that parked cars and vans "cannot obstruct the required clear width of adjacent accessible routes", which is what a wheel stop or a deeper stall depth is for.

Slope is the dimension that ends a striping conversation and starts a paving one. An older Marietta lot that has been overlaid twice can exceed 1:48 at the accessible stalls, because each overlay follows the existing grade and adds thickness at the crown. Paint cannot correct a grade. Thrare Contracting measures and records the slope at each accessible stall and reports a stall that fails, rather than striping a compliant looking rectangle onto non compliant ground.

## Does the federal MUTCD govern the markings inside a private Marietta parking lot?

No. The Manual on Uniform Traffic Control Devices does not reach the parking area itself, and the exclusion is written into the regulation that adopts the manual. 23 CFR 655.603(a) makes the MUTCD "the national standard for all traffic control devices installed on any street, highway, or bicycle trail open to public travel", then states plainly: "Parking areas, driving aisles within parking areas, and private highway-rail grade crossings are also not included in this definition."

The same paragraph is precise about what remains inside the definition, and a Marietta shopping center sits on both sides of the line. 23 CFR 655.603(a) counts as open to public travel "roads within shopping centers, airports, sports arenas, and other similar business and/or recreation facilities that are privately owned but where the public is allowed to travel without access restrictions." So the ring road through a Barrett Parkway center is inside MUTCD applicability while the stalls and the driving aisles between them are outside it.

Retroreflectivity is where the trade most often overstates the manual. Section 3A.05 of the MUTCD 11th Edition, published December 2023, requires that "a method designed to maintain retroreflectivity at or above 50 mcd/m2/lx under dry conditions shall be used for longitudinal markings on roadways with speed limits of 35 mph or greater." Paragraph 5 of that same section then lists what the requirement excludes, and the list names "D. Curb markings; E. Parking space markings". A bid that sells a private lot re-stripe on MUTCD retroreflectivity compliance is quoting a rule that reaches neither the location nor the marking type. Glass bead application is still worth specifying on a dark lot, and Thrare Contracting will quote it, as a night visibility decision rather than as a compliance obligation.

### What does the MUTCD usefully supply for a parking lot?

The manual supplies a color and symbol vocabulary that drivers already read, which is worth following on private property even where no rule compels it. Section 3A.03 states that "Markings shall be yellow, white, red, blue, or purple", and paragraph 6 of the same section states that "When used, blue markings shall supplement white markings for parking spaces for persons with disabilities." Blue supplements white in the manual rather than replacing it. Section 3B.22 paragraph 8 advises that the International Symbol of Accessibility parking space marking "should be placed in each parking space designated for use by persons with disabilities", and section 3B.27 requires white markings for on-street parking spaces, which is a street rule and not a private lot rule. Section 3B.18 paragraph 5 leaves special curb colors to local highway agencies, which is why red fire lane curbing is a local fire code question and gets confirmed with the authority having jurisdiction rather than assumed.

## Which government's rules reach a lot inside the Marietta city limits?

A parking lot inside the Marietta city limits sits under the City of Marietta's own ordinances, and the Official Code of Cobb County does not reach it. Section 50-181 of the Official Code of Cobb County scopes the county separate storm drainage system to conveyances owned or maintained by unincorporated Cobb County. Section 7-8-18-020 of the Marietta Code of Ordinances scopes the city system to a facility "Owned or maintained by the city", not a combined sewer, and not part of a publicly owned treatment works. Two separate systems, two separate ordinances, and one address falls under exactly one of them.

That distinction is not academic on a striping job, because Cobb County Water publishes exterior cleaning guidance that circulates widely in the trade and that guidance is written for unincorporated addresses. Quoting it at a Marietta Square property as the governing requirement misstates the authority. The practical instruction to a crew does not change: contain the water either way. The ordinance cited on the closeout paperwork does change, and a compliance file is only as good as the citation in it.

Thrare Contracting is based in Atlanta at 8735 Dunwoody Pl, Ste R, Atlanta, GA 30350, and serves Marietta and Cobb County as a service area. The company confirms the governing jurisdiction for each address at quoting rather than applying one metro wide assumption, because Marietta, Smyrna, Kennesaw, Acworth, Austell and Powder Springs each run their own ordinance inside Cobb County.

## Where can pre-stripe wash water and marking removal residue go in Marietta?

Not into a storm drain. Section 7-8-18-030(A) of the Marietta Code of Ordinances states that "No person shall throw, drain, or otherwise discharge, cause, or allow others under its control to throw, drain, or otherwise discharge into the municipal separate storm sewer system any pollutants or waters containing any pollutants, other than stormwater." A striping job that degreases oil spots or washes the surface before painting produces exactly the material that definition captures.

Section 7-8-18-020 of the same article defines pollutant to expressly include "detergents (biodegradable or otherwise); degreasers; cleaning chemicals", and defines an illegal connection to include any conveyance allowing "any nonstormwater discharge including sewage, process wastewater, and wash water to enter the storm drain system." The exemptions the public works director may allow are a closed list covering water line flushing by a government agency, potable water sources, landscape irrigation, diverted stream flows, rising ground water, ground water infiltration, uncontaminated pumped ground water, foundation and footing drains, crawl space pumps, air conditioning condensation, springs, natural riparian and wetland flows, other water containing no pollutants, and firefighting. Commercial wash water does not appear on that list.

### How does that change the way the job runs?

- Surface preparation on a Marietta lot leads with mechanical methods: blowers, rotary brooms and vacuum sweeping remove the dust and grit that stop paint from bonding, and none of those methods produce a discharge.
- Oil and grease spots that need a degreaser are treated as a contained operation, with the wash water collected rather than rinsed toward the nearest inlet.
- Existing thermoplastic and paint removal is handled as a dry, captured operation, so the removal material leaves the property as solids rather than as a rinse toward an inlet.
- Storm inlets in and downgradient of the work area are covered before the work starts and stay covered until the site is swept.
- Spent material, sweepings and grinding residue leave the property, and the disposal record goes into the closeout package with the layout record.

No penalty figure appears on this page. Marietta's ordinance carries its own enforcement provisions, the amounts depend on the enforcement route taken, and a striping contractor quoting a dollar figure at a property manager is repeating trade folklore rather than the code.

## What hours can a striping crew work on a Marietta property?

Striping is night work, because a stall cannot be laid out or painted with a car parked in it, and night work in Marietta runs into a noise limit that is measured at the neighbor's property line rather than at the lot being worked. The City of Marietta publishes its sound level limits by receiving property as follows.

| Receiving property | 7 a.m. to 11 p.m. | 11 p.m. to 7 a.m. |
| --- | --- | --- |
| Commercial, Business, Residential, Public Space, Institutional, or Noise-Sensitive Facility | 65 dBA, 84 dBC | 60 dBA, 79 dBC |
| Industrial or Manufacturing | 70 dBA, 89 dBC | 70 dBA, 89 dBC |

The City of Marietta states the measurement point directly: "Sound level readings will be measured at or within the real property line of the receiving property." A retail strip zoned commercial that backs onto houses is therefore judged against the residential receiving limit of 60 dBA and 79 dBC after 11 p.m., not against a commercial allowance, because the receiving property is the one that counts. Marietta's page does not print an ordinance section number alongside that table, so the limits are cited here to the City of Marietta noise ordinance page rather than to a numbered code section.

Sequencing follows from the table rather than from preference. Blowers, rotary brooms and grinders are the loud operations on a striping job, so those run before 11 p.m. where a residential receiving property is within earshot. Layout, taping, stencil placement and paint application are quiet and run through the overnight window. Where a property insists on a window that puts loud work after 11 p.m. next to houses, Thrare Contracting says so at quoting rather than discovering it when a resident calls code enforcement at 1 a.m.

## How is a Marietta re-stripe sequenced?

The order matters more than the equipment, because every step that follows an unmeasured layout inherits its errors. Thrare Contracting runs a lot in eight steps.

1. **Measure what exists.** Stall count by area, stall width and depth, accessible stall and aisle dimensions measured centerline to centerline, aisle length, sign presence and mounting height, and slope readings at each accessible stall.
2. **Compare against Table 208.2 and section 502.** The result is a written finding per accessible stall: compliant, correctable by layout, or requiring paving or civil work outside a striping scope.
3. **Agree the layout before any removal.** Changing a stall count changes a lease exhibit and sometimes a zoning parking requirement, so the property approves the new count in writing first.
4. **Agree removals.** Lines that move need the old marking removed rather than painted over, because a ghost line beside a new line reads as two lines at night.
5. **Prepare the surface.** Blow, sweep and vacuum the work area, treat oil spots as a contained operation, and cover storm inlets before anything starts.
6. **Lay out with string and chalk.** Control points are set off fixed building features rather than off the old paint, which is the step that breaks the copy-the-error cycle.
7. **Apply in sections.** The lot is worked in blocks so that a portion stays open where the property needs it, with cones and barricades holding the wet block until the paint is walk safe and drive safe per the product data sheet.
8. **Document and close out.** Photographs before and after, the measured layout record, slope readings, disposal record, and a punch list of anything found outside the striping scope.

Cure and open-to-traffic times come from the manufacturer data sheet for the specific product and the conditions on the night, not from a number printed on a website. Temperature, humidity and surface moisture all move that number, which is why no cure time is printed on this page. Thrare Contracting states the expected open time for the actual product before the crew mobilizes.

## What is in a striping price and what is not?

Every striping proposal from Thrare Contracting names both halves, because the disputes on this trade come from the second half. No price appears on this page: a striping number follows a site measurement, since stall count, condition, removal quantity and the size of the work window each move it.

### In the number

- Measurement of the existing layout and the written comparison against Table 208.2 and section 502.
- Layout from fixed control points, including string lines and chalk.
- Surface preparation of the work area by blowing, sweeping and vacuuming.
- Stall lines, double lines where specified, directional arrows, stop bars, crosswalks and word stencils.
- Accessible stall marking, access aisle hatching and the International Symbol of Accessibility in each accessible stall.
- Fire lane striping and curb painting where the scope names it.
- Cones, barricades and internal traffic control for the work area, and inlet protection.
- Photographic documentation, the measured layout record and the slope readings at accessible stalls.

### Not in the number unless the proposal says so

- Asphalt repair, pothole patching, crack sealing, seal coating and mill and overlay.
- Any civil work to correct a stall or aisle that exceeds the 1:48 slope limit in section 502.4.
- Sign posts, sign panels, bollards and wheel stops, including the sign required at 60 inches to the bottom edge by section 502.6.
- Removal of existing thermoplastic, which is priced by quantity once the removal extent is known.
- Permits or right of way approvals where the city requires them for work touching the public right of way.
- Off duty police or certified flagging where work extends past the property line into a city street.
- Vertical clearance corrections under a canopy or deck to reach the 98 inch minimum in section 502.5.
- Landscaping, tree trimming or bollard relocation needed to open an accessible route.

Anything found during measurement that falls outside the striping scope goes on the punch list with a photograph rather than being absorbed quietly or invoiced as a surprise.

## What does Thrare Contracting need from a Marietta property before mobilizing?

- A site plan or an accurate parking count, separated by lot where the property has more than one parking facility, because section 208.2 calculates the accessible minimum for each facility separately.
- A named contact who can authorize closing part or all of the lot, and the hours the lot can actually be emptied.
- Tenant and resident notice handled by management, posted far enough ahead that cars move on their own.
- Confirmation of where the property line meets the public right of way, since work past that line changes the permitting and traffic control picture.
- Any prior ADA demand letter, complaint, consent order or fire marshal notice covering the lot, so the layout answers what was actually cited.
- The paint or thermoplastic specification where the property or a franchise standardizes one.
- Whether a residential property line abuts the lot, which decides how the loud work is sequenced against the 11 p.m. threshold in the City of Marietta noise limits.

## What applies when the lot belongs to a Cobb County agency?

Cobb County Procurement Services publishes both the registration steps and the dollar thresholds that decide how a striping job is solicited. Cobb County Procurement Services states that "All purchases of goods and/or services estimated to be in excess of $50,000.00 are advertised by the Cobb County Procurement Services Department and in the Marietta Daily Journal", that responses to quotation requests "greater than $10,000 but less than $50,000 must be submitted in writing", and that quotation requests under $10,000.00 "may be responded to verbally but we encourage written responses". Registration is not complete until a W-9 reaches vendor.enrollment@cobbcounty.gov, and the county adds that a vendor "will not be activated in the system until verbal verification is completed."

Those thresholds belong to Cobb County. They are not Georgia thresholds, they are not federal thresholds, and they are not the City of Marietta's, which runs its own purchasing for a city owned lot. Cobb County also states that "All vendors, contractors and subcontractors are required to provide proof of eligibility of their employees to work in the United States upon request."

### Which certifications and registrations can a public buyer verify?

Rare Earth Ltd, doing business as Thrare Contracting, holds DBE, ACDBE and MBE certification, qualifies as a small disadvantaged business, is registered in SAM under UEI Z4WKS4UE8NJ6 and CAGE 9JAV8, and is enrolled in E-Verify. Rare Earth Ltd does not hold HUBZone certification, 8(a) certification or SOC 2 attestation and does not represent otherwise. The one verified past performance figure the company publishes is $198,000 in recycled aggregate supplied to Fulton County Public Works.

## Which nearby cities have their own lot striping page?

Each city page carries what is genuinely local to that jurisdiction, and the shared company policy on layout method, scope and documentation sits on one hub page rather than being restated everywhere.

- [Parking lot striping and ADA layout](https://www.thrarecontracting.com/parking-lot-striping-and-ada), the hub page carrying the method and the scope in full
- [Parking lot striping in Atlanta](https://www.thrarecontracting.com/parking-lot-striping-atlanta)
- [Parking lot striping in Roswell](https://www.thrarecontracting.com/parking-lot-striping-roswell)
- [Parking lot striping in Alpharetta](https://www.thrarecontracting.com/parking-lot-striping-alpharetta)
- [Parking lot striping in Decatur](https://www.thrarecontracting.com/parking-lot-striping-decatur)

### What else runs on the same Marietta mobilization?

- [Parking lot cleaning in Marietta](https://www.thrarecontracting.com/parking-lot-cleaning-marietta), which is the surface preparation step sold on its own interval
- [Commercial pressure washing in Marietta](https://www.thrarecontracting.com/commercial-pressure-washing-marietta), where the same wash water rules under section 7-8-18-030 apply
- [Parking decks and structured parking](https://www.thrarecontracting.com/parking-decks-and-structured-parking), where the 98 inch vertical clearance in section 502.5 governs the van route

## Frequently asked questions

**How many accessible spaces does a 120 space lot in Marietta need?**

A parking facility of 120 spaces owes 5 accessible spaces under Table 208.2 of the 2010 ADA Standards for Accessible Design, which sets 5 for the 101 to 150 range, and at least 1 of those 5 must be a van space under section 208.2.4. If the property has a second, separate lot, that lot is counted on its own, because section 208.2 calculates the required number for each parking facility rather than for the site as a whole.

**Does a re-stripe have to correct an existing ADA layout error?**

A re-stripe that reproduces a non compliant layout leaves the property in the same position it started in, and repainting is a poor moment to preserve an error, since the layout is already being set. Thrare Contracting measures every accessible stall and aisle against sections 502.1 through 502.7 before quoting and states in the proposal which stalls comply, which can be corrected by layout alone, and which need paving or civil work that falls outside a striping scope. Whether a given property is legally obligated to alter an existing lot is a question for the property's own counsel, not for a striping contractor.

**Is Thrare Contracting located in Marietta?**

Thrare Contracting is based in Atlanta at 8735 Dunwoody Pl, Ste R, Atlanta, GA 30350, and serves Marietta and the rest of Cobb County as a service area. The company confirms which jurisdiction governs each address at quoting, because Marietta, Smyrna, Kennesaw, Acworth, Austell and Powder Springs each run ordinances of their own inside Cobb County and the Official Code of Cobb County reaches only unincorporated addresses.

**Does the MUTCD set a retroreflectivity requirement for parking stall markings?**

No. 23 CFR 655.603(a) states that "Parking areas, driving aisles within parking areas, and private highway-rail grade crossings are also not included in this definition" of a facility open to public travel, so the Manual on Uniform Traffic Control Devices does not reach a private lot's stalls. Section 3A.05 of the MUTCD 11th Edition, which sets 50 mcd/m2/lx for longitudinal markings on roadways posted at 35 mph or greater, lists curb markings and parking space markings among the markings its paragraph 5 excludes. Glass beads remain worth specifying on a dark lot as a night visibility decision.

**Can a striping crew work overnight on a Marietta lot next to houses?**

Overnight work is possible, and the loud portion of it gets sequenced before 11 p.m. The City of Marietta sets 60 dBA and 79 dBC from 11 p.m. to 7 a.m. for a residential, commercial, institutional or noise-sensitive receiving property, against 65 dBA and 84 dBC during the day, and states that "Sound level readings will be measured at or within the real property line of the receiving property." A commercially zoned lot backing onto houses is therefore judged at the houses. Blowers, brooms and grinders run before the 11 p.m. threshold, and layout, taping and paint application run through the overnight window.

**Which certifications can a Cobb County or City of Marietta buyer verify?**

Rare Earth Ltd, doing business as Thrare Contracting, holds DBE, ACDBE and MBE certification, qualifies as a small disadvantaged business, is registered in SAM under UEI Z4WKS4UE8NJ6 and CAGE 9JAV8, and is enrolled in E-Verify. Rare Earth Ltd does not hold HUBZone certification, 8(a) certification or SOC 2 attestation and does not represent otherwise. Cobb County Procurement Services requires a completed W-9 emailed to vendor.enrollment@cobbcounty.gov before a vendor application is activated, and requires proof of employee work eligibility upon request.

## Sources

- [United States Access Board, 2010 ADA Standards for Accessible Design](https://www.access-board.gov/ada/). Table 208.2 and the minimum number of accessible spaces at 208.2; van ratio at 208.2.4; residential parking at 208.2.3.2; location on the shortest accessible route at 208.3.1; sign requirement and the four-space exception at 216.5; stall and aisle dimensions, measurement from centerline, marking, location, slope, vertical clearance, identification and route obstruction at 502.1 through 502.7. Read 2026-09-03.
- [United States Access Board, Guide to the ADA Standards, Chapter 5: Parking Spaces](https://www.access-board.gov/ada/guides/chapter-5-parking/). Accessible space counts, van accessible ratio, 60 inch access aisle, 96 inch and 132 inch space widths, 98 inch vertical clearance, and the 60 inch sign height to the bottom edge. Read 2026-08-31 and re-read 2026-09-03.
- [23 CFR 655.603, Standards](https://www.govinfo.gov/content/pkg/CFR-2024-title23-vol1/xml/CFR-2024-title23-vol1-sec655-603.xml), U.S. Government Publishing Office. Paragraph (a), National MUTCD: the definition of open to public travel, the inclusion of roads within shopping centers, and the exclusion of parking areas and driving aisles within parking areas. Read 2026-09-03.
- [Federal Highway Administration, Manual on Uniform Traffic Control Devices, 11th Edition, December 2023, Part 3, Markings](https://mutcd.fhwa.dot.gov/pdfs/11th_Edition/part3.pdf). Marking colors and the blue supplement for accessible spaces at 3A.03; minimum maintained retroreflectivity and the excluded marking types at 3A.05; curb markings for parking regulations at 3B.18; the International Symbol of Accessibility pavement marking at 3B.22; on-street parking space markings at 3B.27. Read 2026-09-03.
- [City of Marietta Code of Ordinances, Part 7, Chapter 7-8, Article 7-8-18, Illicit Discharge and Illegal Connection](https://library.municode.com/ga/marietta/codes/code_of_ordinances?nodeId=COOR_PT7PLDE_CH7-8CODECO_ART7-8-18ILDIILCO), via Municode. Definitions of illicit discharge, municipal separate storm sewer system, illegal connection and pollutant at 7-8-18-020; prohibitions and the exemption list at 7-8-18-030. Ord. No. 6636, 3/10/2004, section 7.6. Read 2026-09-02.
- [City of Marietta, Development Services, Code Enforcement, Noise Ordinance](https://www.mariettaga.gov/388/Noise-Ordinance). Sound Level Limits by Receiving Property table, and the statement that readings are measured at or within the real property line of the receiving property. The city page does not print an ordinance section number beside the table. Read 2026-09-02.
- [Cobb County Procurement Services, Bidding Information](https://www.cobbcounty.gov/procurement-services/bidding-information). Advertisement of purchases in excess of $50,000.00 in the Marietta Daily Journal; written responses required between $10,000 and $50,000; verbal responses accepted under $10,000.00. Read 2026-09-02.
- [Cobb County Procurement Services, Vendor Registration](https://www.cobbcounty.gov/procurement-services/vendor-registration). W-9 required to vendor.enrollment@cobbcounty.gov before activation; verbal verification of the application; proof of employee work eligibility upon request. Read 2026-09-02.
- [Official Code of Cobb County, Georgia](https://library.municode.com/ga/cobb_county/codes/code_of_ordinances), via Municode. Section 50-181 scopes the county separate storm drainage system to conveyances owned or maintained by unincorporated Cobb County, which is why the county ordinance does not reach an address inside an incorporated city. Read 2026-09-02.

## Request a measured striping proposal for a Marietta lot