---
title: "Apartment Pressure Washing Alpharetta GA | Thrare"
description: "Apartment pressure washing for Alpharetta GA communities, scheduled inside the hours Alpharetta sets for construction and yard equipment."
url: "https://www.thrarecontracting.com/apartment-pressure-washing-alpharetta"
last_updated: 2026-11-27
---

# Apartment Pressure Washing in Alpharetta, Scheduled Inside the City's Construction and Yard Equipment Hours

Exterior cleaning programs for Alpharetta and North Fulton garden style communities, mid rise buildings and condominium associations, worked one building at a time

ALPHARETTA MULTIFAMILY

## Who does Thrare Contracting pressure wash apartment communities for in Alpharetta?

Thrare Contracting pressure washes apartment communities across Alpharetta and North Fulton for property management companies, ownership groups, community association boards and on site managers. The stock along the GA-400 corridor runs to garden style walk ups, townhome rental developments, wrap decks and mid rise buildings, and one mobilization covers many buildings on a scope that repeats on a budgeted schedule.

The company is Rare Earth Ltd, trading as Thrare Contracting, and it keeps one office: 8735 Dunwoody Pl, Ste R, Atlanta, GA 30350. Rare Earth Ltd has operated since January 19, 2020, and Alpharetta is a service area at the north end of that radius rather than a second location. The credentials a vendor file asks for are DBE and ACDBE certification, MBE certification, small disadvantaged business status, E-Verify enrollment, SAM registration under UEI Z4WKS4UE8NJ6, and CAGE code 9JAV8. Three things a North Fulton owner should never be told this company holds, because it does not: HUBZone, 8(a) and SOC 2. Everything on the held list can be looked up by an owner without a phone call.

### What hours does Thrare Contracting work at an Alpharetta apartment community, and what does the city actually restrict?

Thrare Contracting works an Alpharetta apartment community from 7:00 a.m. to 7:00 p.m. on weekdays and from 9:00 a.m. to 5:00 p.m. on Saturday. That is this company's scheduling policy, and it is worth stating plainly that it is not a citation: the Alpharetta Code of Ordinances does not name pressure washing, power washing or exterior cleaning as a restricted activity anywhere in Article V of Chapter 26. A contractor who tells an Alpharetta board that the city has set hours for this specific trade is reading a rule that is not on the page.

What Article V does set is a window around two activities that sit either side of exterior cleaning. Section 26-116(3) states that "construction and demolition activity shall not be performed between the hours of 7:00 p.m. and 7:00 a.m. on weekdays, before the hour of 9:00 a.m. or after the hour of 5:00 p.m. on Saturday, or at any time on Sunday, unless such activities are deemed emergency work as defined in section 26-113". Emergency work is the only exception paragraph (3) carries, and there is no sound level escape from it. Section 26-116(2) reaches equipment rather than trade, and it carries two exceptions rather than one: commercial or industrial power tools used for landscaping and yard maintenance must be operated with a muffler, and "all motorized equipment used in these activities shall not be operated on a residential property, or within 250 feet of a residential property line, between the hours of 7:00 p.m. and 7:00 a.m. on weekdays, or before the hour of 9:00 a.m. or after the hour of 5:00 p.m. on Saturday, or at any time on Sunday", unless such activities "are deemed emergency work" or "meet the limits set forth in section 26-114(a)" (Alpharetta Code of Ordinances, Chapter 26, Article V, section 26-116, current through Ord. No. 824, section 1, 4-5-2021, read 2026-09-02).

Neither paragraph names this work, and both bracket the identical window, which is why the policy is modeled on them. A code officer answering a 6:00 a.m. resident complaint about a machine running in a courtyard will reach for whichever of the two paragraphs he thinks fits, and a crew already inside that window has nothing to argue about. That inference belongs to Thrare Contracting, not to the City of Alpharetta, and a board is entitled to see which half is which.

Section 26-114 is a different kind of rule, because it is written about sound rather than about a named activity, but it does not escape the classification question either. Section 26-116 opens "Notwithstanding the provisions of section 26-114(a) and the exceptions in section 26-115", and 26-116(2) ends by providing that "at all other times, the limits set forth in section 26-114(a) do not apply to commercial or industrial power tools and landscaping and yard maintenance equipment". So section 26-114(a) governs a daytime pressure washer unless the work is classed as commercial power tool landscaping or yard maintenance under 26-116(2), in which case the daytime limits are lifted for that equipment. Overnight is the case that does not turn on the classification, because inside the hours 26-116(2) restricts, equipment covered by that paragraph is barred unless it meets section 26-114(a) anyway. Measured at or within the real property line of the receiving property, section 26-114(a) holds a residential or noise sensitive receiving property to 60 dBA between 7:00 a.m. and 11:00 p.m. and 55 dBA between 11:00 p.m. and 7:00 a.m., and allows a commercial or business receiving property 65 dBA and 60 dBA. Section 26-114(c) is stricter again inside a multifamily dwelling, at 55 dBA daytime and 45 dBA from 11:00 p.m. to 7:00 a.m., "as measured from the closest neighbor's dwelling" (Alpharetta Code of Ordinances, section 26-114, read 2026-09-02).

Two consequences change a bid, and both survive the correction above. First, an overnight deck wash at a garden style Alpharetta community has to hold 55 dBA at the receiving line whichever way the classification falls, which a gas machine parked in a courtyard will not do, so overnight work here is a sound question before it is a scheduling question. Second, a Saturday under this policy starts at 9:00 a.m. and stops at 5:00 p.m., eight hours against twelve on a weekday, so a Saturday reaches fewer buildings and a bidder who prices an Alpharetta Saturday like a weekday has priced the wrong day. Section 26-116(3) does add that if the director of public safety, after consultation with the mayor and council, determines that the prohibitions in that paragraph "would result in loss or inconvenience to any party in interest of such a nature as to warrant special consideration, the director of public safety may issue a renewable 14-day permit for work to be done within the hours of 10:00 a.m. to 5:00 p.m.", and that is a discretionary permit attached to the activities the paragraph names, never something to promise a property in advance.

### What is the North Fulton leasing constraint that exterior condition moves?

Turnover is the operating line that exterior condition reaches. The National Apartment Association, drawing on its 2019 Survey of Operating Income and Expenses in Rental Housing Communities, puts the apartment turnover rate at 46.8 percent, the conservatively calculated cost of a single move-out at $1,800, and the yearly bill at a 200 unit community above $168,000 (National Apartment Association, Apartment Turnover, dated 2025-03-06, read 2026-09-02). Read 46.8 percent as a 2019 survey result republished in 2025 guidance rather than as this year's rate. NAA's working day guidelines for turning a unit, and the rest of that arithmetic, are quoted in full on the [metro Atlanta apartment pressure washing page](https://www.thrarecontracting.com/apartment-pressure-washing-atlanta), which is the hub for the material that does not change between cities.

Alpharetta adds a second pressure that metro Atlanta as a whole does not. A community on Windward Parkway or Encore Parkway is shopped against recently delivered Class A stock a few minutes up the same road, so a prospect walks a breezeway here having walked a two year old breezeway an hour earlier. Exterior condition is the part of that comparison an on site manager can move inside an operating budget, without a capital request and without waiting for a board vote.

### What does an apartment pressure washing scope in Alpharetta cover?

An Alpharetta scope is written building by building, and on North Fulton stock the cladding mix decides more of it than the square footage does.

- **[Building exterior washing](https://www.thrarecontracting.com/building-washing-alpharetta)**: fiber cement above a brick or stone water table on most post-2000 North Fulton buildings, with the machine setting changed where the cladding changes partway up an elevation.
- **Breezeway, stair and landing cleaning**: treads, risers, landings, handrails and the soffit overhead in one pass per building, because a bright floor under a gray soffit is the thing a prospect notices.
- **Sidewalk, courtyard and paver cleaning**: poured walks, mail kiosks, dog runs, and the segmental paver courtyards common in newer Alpharetta amenity areas, where joint sand is what is actually at risk.
- **[Parking lot and deck cleaning](https://www.thrarecontracting.com/parking-lot-cleaning-alpharetta)**: surface lots, tuck under parking and the structured decks on Alpharetta mid rise product, taken a bay at a time so the resident space count never drops.
- **Pool deck and amenity cleaning**: coping, cabanas, grill stations and clubhouse frontage, booked around the posted amenity hours.
- **Dumpster pad and compactor degreasing**: the enclosure slab, the compactor pad and the approach lane, which is where an odor complaint starts.
- **Entrance monument and gate cleaning**: monument stonework, the directory panel and the gate surround, which on a gated Alpharetta community is the first surface a prospect stops at.
- **Make ready exterior cleaning**: balcony floor, patio slab and entry railing on a turn unit, run alongside the interior work described at [multifamily turns and preservation](https://www.thrarecontracting.com/multifamily-turns-and-preservation).

### How is pressure washing sequenced on an occupied Alpharetta community?

Sequencing is what keeps an occupied Alpharetta community leasable while it is being cleaned: one building is out of service at a time, and never the amenity path.

1. Walk the property with the manager, number every building, and record cladding by elevation, spigot locations, the drainage path, and any surface that needs a test patch before production starts.
2. Fix the daily window at 7:00 a.m. to 7:00 p.m. on weekdays and 9:00 a.m. to 5:00 p.m. on Saturday inside the schedule itself, so the shorter Saturday is priced rather than discovered.
3. Hand the office a resident notice it can send on its own letterhead, timed to the notice period the property already uses.
4. Trial clean one sample area per cladding type, then let the wall dry before anybody judges the result.
5. Take each building from the soffit down to the walkway at grade, so no finished surface sits under one still being worked.
6. Hold runoff off the storm inlets, and keep everything below the work area wet through the rinse so no streak sets.
7. Shoot every building before and after, then pull the cones and clear the staging bay before the crew leaves that building.
8. Close the visit with a per building report, plus a punch list of what the wash exposed that cleaning does not fix.

### What sits inside an Alpharetta price, and what never does?

An Alpharetta quote is built from six inputs and names all six, so a manager can check it line for line against the next bid: building count, stories, cladding by elevation, walkway and parking square footage, access, and how many visits a year.

- **Inside the price**: surface protection and pre wetting, the per cladding trial clean, chemistry, the wash and the rinse, runoff control, cleanup, and the building by building photo set.
- **Inside the price once the scope names it**: compactor and dumpster pad degreasing, monument and gate cleaning, pool deck work, gum removal, and rust or irrigation staining.
- **Never inside the price**: paint, sealant replacement, stucco and EIFS repair, concrete repair, roof work, and [gutter cleaning](https://www.thrarecontracting.com/gutter-cleaning-alpharetta). Every one of those is a separate trade, and burying one inside a wash line item is how a clean scope becomes a change order.
- **Quoted as its own line**: boom or lift access above ladder reach, work outside the 7:00 a.m. to 7:00 p.m. policy window, water by tank where no usable spigot exists, joint sand replacement on a paver area, and traffic control on a lane that cannot be closed in sections.

No per unit figure is published on this page. A number given before anybody has seen the cladding, the water source and where the site drains is a guess wearing a decimal point.

### What does Thrare Contracting need from an Alpharetta property manager?

- One site contact who can open a gate and approve access, plus the building count and the units in each.
- Cladding by elevation, or a site plan and elevation photographs good enough to read it from.
- Spigot locations, and whether the property bills water back.
- Gate codes and a staging bay, plus any parking row that has to stay open through the visit.
- The resident notice period the property uses, and who sends the notice.
- Vendor onboarding: W-9 routing, the certificate holder wording, and where invoices go.
- Whether the cladding is still inside a manufacturer warranty, and any surface already known to be failing.

PUBLISHED LIMITS

## What pressure is safe on the cladding used in newer North Fulton apartment stock?

Fiber cement governs much of the newer Alpharetta garden style and townhome rental stock, and the manufacturer publishes a number. James Hardie, in Technical Bulletin #20, "Cleaning James Hardie Primed and ColorPlus Technology Siding", states: "Low pressure water spray, a soft bristle (nonmetal) brush is most suitable for cleaning fiber cement products. If using a pressure washer, care must be taken to ensure that the water stream does not damage the surface of the siding. Using wide fan tips that are kept a minimum of 6 feet from the wall and at pressures under 1500 psi will minimize the chance of damaging the siding." (James Hardie Building Products, Technical Bulletin #20, November 2018, document USTB 20 version 2, read 2026-09-02).

The same bulletin rules out two methods and attaches a warranty consequence. James Hardie states that "sand blasting can damage the fiber cement surface and is not recommended", that "acid washing can damage the fiber cement surface and is not recommended", and that "damage to siding arising from improper cleaning or maintenance may not be covered by the James Hardie warranty". On a community still inside its cladding warranty, an overpowered wash is a warranty question and not only a finish question.

Brick veneer sits below that fiber cement on many North Fulton elevations, and it carries a far lower ceiling. The Brick Industry Association holds brick cleaning to 400 psi measured at the nozzle tip unless the brick manufacturer permits more, treats anything above 800 psi as inappropriate for brick, limits applied cleaning solution to 50 psi, and asks for a 20 square foot trial area left to dry before the result is judged (Brick Industry Association, Technical Notes on Brick Construction 20, "Cleaning Brickwork", August 2018, read 2026-09-02). The verbatim text of those limits, together with the nozzle angle and standoff distance the same document specifies, is quoted on the [metro Atlanta apartment page](https://www.thrarecontracting.com/apartment-pressure-washing-atlanta), where brick veneer is the dominant cladding rather than the base course.

Read the two published numbers together: under 1,500 psi at 6 feet for fiber cement, and no more than 400 psi at the nozzle tip for brick. One machine setting cannot be correct for both, and an Alpharetta building with a brick base and fiber cement above needs the setting changed partway up the elevation. Mortar removed by an overpowered tip is a water path into the wall assembly. A manager comparing bids should ask what pressure each bidder runs at the tip per cladding, and note that stucco, EIFS, vinyl and metal panel carry limits neither document covers.

### What pressure is safe on a paver courtyard at a newer Alpharetta community?

Segmental paver courtyards, paver amenity decks and paver drive aprons show up repeatedly on Alpharetta stock built in the last twenty years, and the thing at risk there is joint sand rather than the paver. The Concrete Masonry and Hardscapes Association, in "Cleaning, Sealing and Joint Sand Stabilization of Interlocking Concrete Pavement", PAV-TEC-005-22, states that "a high pressure sprayer applies cleaner and water between 1,000 and 4,000 psi (6.9 and 27.6 MPa), and at a rate between 2 and 6 gallons/minute (7.6 and 22.7 liters/minute)", that cleaners for efflorescence go on "with a low pressure pump spray 30 to 100 psi (0.2 to 0.7 MPa)", and that "a nozzle that creates a wide spray enables a large area to be covered efficiently and prevents sand from being washed from the joints", adding that "a low angle of attack from a wide nozzle spray will also reduce the risk of dislodging joint sand" (Concrete Masonry and Hardscapes Association, PAV-TEC-005-22, read 2026-08-31).

Two limits on that figure belong beside it. CMHA publishes it as a trade association standard for interlocking concrete pavement, not as a regulation, and it says nothing about what a poured concrete slab will tolerate. A courtyard washed at a steep angle with a narrow tip loses joint sand, and re-sanding is a line item nobody bid, which is why joint sand replacement is quoted separately above rather than assumed.

## Where does wash water go on an Alpharetta apartment property?

Wash water from an Alpharetta apartment community stays on the property, and the rule that makes that necessary is federal rather than municipal. 40 CFR 122.26(b)(2) defines an illicit discharge as any discharge into a municipal separate storm sewer that is not composed entirely of storm water, setting aside a discharge made under an NPDES permit or one resulting from fire fighting (40 CFR 122.26, via the Cornell Legal Information Institute, read 2026-08-31). No apartment community holds an NPDES permit for washing a breezeway, and breezeway or dumpster pad runoff carries sediment, food residue, oil and grease, so it does not qualify as entirely storm water. In Georgia that program is run by the Environmental Protection Division's Watershed Protection Branch, and the inlets in an Alpharetta parking lot feed a municipal system (Georgia EPD, Stormwater, read 2026-08-31).

Containment is therefore part of the scope rather than an extra. Inlets inside the work area are matted or blocked, runoff is steered to a vegetated area where soil does the filtering, and the remainder is vacuum recovered. The Brick Industry Association sets out the same expectation for masonry cleaning: "Dilution of runoff and its release into the stormwater management system should not be expected or allowed unless expressly permitted by the applicable jurisdiction." The longer federal treatment, including how the EPA describes the reach of the NPDES stormwater program, is on the [metro Atlanta apartment pressure washing page](https://www.thrarecontracting.com/apartment-pressure-washing-atlanta).

### How often should an Alpharetta apartment community be pressure washed?

Two full property washes a year is the base cycle at an Alpharetta community, with the compactor pad, the dumpster enclosures and the breezeways on a tighter interval than the buildings.

North Fulton's calendar picks the dates. Tree pollen loads every horizontal surface from late February into April, so a February wash is undone by the middle of March and a late April wash is the one that holds through the leasing peak. Hardwood leaf drop runs into November and stains concrete anywhere wet leaves sit, so the second visit follows the drop rather than leading it.

Rainfall is the second input, and North Fulton runs wetter than the airport number a metro Atlanta page usually quotes. NOAA's twelve 1991-2020 monthly precipitation normals sum to 56.37 inches at station USC00092408, Cumming 2N, immediately north of Alpharetta, and 56.32 inches at station USC00096407, Norcross, against 50.43 inches at station USW00013874, Atlanta Hartsfield-Jackson International Airport (NOAA National Centers for Environmental Information, U.S. Monthly Climate Normals 1991-2020, read 2026-09-02). State that carefully: NOAA publishes no 1991-2020 normal for the Alpharetta 4 SSW station, so Cumming 2N and Norcross bracket Alpharetta and neither figure is an Alpharetta measurement, and a normal is a 30 year station average rather than a total for any single year. Six extra inches over the airport is why a shaded north facing walkway here greens up sooner than the calendar suggests, and why a building tight against a wooded buffer earns a tighter interval than a building on the open side of the same property.

### Who approves exterior cleaning at an HOA adjacent community in Alpharetta?

For a Georgia planned community that has submitted itself to the Property Owners' Association Act, the board approves a maintenance contract without an owner vote by default. O.C.G.A. section 44-3-231(f) states that "except to the extent otherwise expressly required by this article, by Chapter 2 or 3 of Title 14, by the instrument, by the articles of incorporation, or by the bylaws of the association, the powers inherent in or expressly granted to the association may be exercised by the board of directors, acting through the officers, without any further consent or action on the part of the lot owners", and section 44-3-231(a)(1) grants the association power to "employ, retain, dismiss, and replace agents and employees to exercise and discharge the powers and responsibilities of the association" (O.C.G.A. 44-3-231, 2025 Code of Georgia, read 2026-09-02).

Two qualifications belong with that statute. The Property Owners' Association Act governs planned communities that opted into it and does not govern condominiums, which fall under the Georgia Condominium Act. Both quoted provisions are expressly subordinate to the association's own instrument, so board authority is the default and the declaration controls.

The Foundation for Community Association Research, in its 2025 U.S. National and State Statistical Review, estimates 11,400 community associations in Georgia covering about 889,000 units and about 2,326,000 residents, and estimates that 30 to 40 percent of community associations nationally are self managed (Foundation for Community Association Research, published March 2026, read 2026-09-02). The Foundation describes those numbers as curated estimates rather than a census count. A self managed Alpharetta association has no on site manager to walk a scope, so the site walk matters more there rather than less.

### Is exterior cleaning a reserve item or an operating expense at an Alpharetta condominium association?

Exterior cleaning is an operating expense, and the distinction matters to a condominium board looking at its reserve study. The Fannie Mae Selling Guide, at B4-2.2-01 Full Review Process effective 2026-08-05, requires a project budget to "provide for the funding of replacement reserves for capital expenditures and deferred maintenance that is at least 10% of the budget", calculated by dividing "the annual budgeted replacement reserve allocation by the association's annual budgeted assessment income", and expects a reserve study to address "all major components and elements of the project's common areas for which repair, maintenance, or replacement is expected" as well as "the condition and remaining useful life of each major component" (Fannie Mae Selling Guide B4-2.2-01, read 2026-09-02).

That is a lender eligibility test applied when Fannie Mae reviews a condominium project before it will buy a loan on a unit inside it. The Selling Guide is not a Georgia statute, no Georgia association is legally obliged to follow it, and the 10 percent test runs against the project budget rather than against any single component. Read against it, a recurring wash is the maintenance that keeps a component's remaining useful life where the study assumed it would be, which is a different budget conversation from replacing that component early.

### What should an Alpharetta board or owner verify before a contractor starts?

Georgia publishes an employer threshold a board can check in one sentence. The Georgia State Board of Workers' Compensation states that "every employer, individual, firm, association, or corporation, regularly employing three or more persons, part-time or full time, shall provide workers' compensation insurance coverage", and adds that "exempted officers of corporations or exempted members of limited liability companies shall not reduce the number of employees for this purpose" (Georgia State Board of Workers' Compensation, Employer Information, read 2026-09-02).

- A certificate of insurance issued directly by the agent, naming the additional insureds the agreement requires.
- Written confirmation of how wash water is contained at the storm inlets.
- The pressure run at the nozzle tip, stated per cladding type rather than as one number.
- The daily start and stop times, and whether the bidder holds itself to the section 26-116 window as a matter of policy or has simply assumed the city sets one for this trade.
- A named site supervisor, and how residents reach the office during the visit.
- The closeout format: photographs organized by building, and a punch list.

### Which Alpharetta and North Fulton areas does Thrare Contracting serve?

- Alpharetta: Windward Parkway, Encore Parkway, Westside Parkway, Old Milton Parkway, Haynes Bridge Road, North Point Parkway, Mansell Road, Webb Bridge Road and the GA-9 Alpharetta Highway corridor.
- North Fulton: Milton, Roswell, Johns Creek and Sandy Springs.
- Forsyth County, north on GA-400: Cumming and the McFarland Parkway corridor.
- Fulton County generally, and Gwinnett, Cobb, DeKalb, Clayton, Henry, Rockdale, Douglas and Fayette counties.

### What else runs on the same Alpharetta mobilization?

A wash costs less per building when the trailer is already on site for something the property had scheduled anyway.

- [commercial pressure washing in Alpharetta](https://www.thrarecontracting.com/commercial-pressure-washing-alpharetta)
- [parking lot striping in Alpharetta](https://www.thrarecontracting.com/parking-lot-striping-alpharetta)
- [gutter cleaning for multifamily buildings](https://www.thrarecontracting.com/gutter-cleaning-alpharetta)
- [apartment pressure washing across metro Atlanta](https://www.thrarecontracting.com/apartment-pressure-washing-atlanta)
- [HOA and community association pressure washing](https://www.thrarecontracting.com/hoa-pressure-washing-atlanta)
- [multifamily turns and property preservation](https://www.thrarecontracting.com/multifamily-turns-and-preservation)
- [the property manager services overview](https://www.thrarecontracting.com/property-managers)

## Frequently asked questions

**What hours does Thrare Contracting work at an Alpharetta apartment community?**

Weekdays 7:00 a.m. to 7:00 p.m., and Saturday 9:00 a.m. to 5:00 p.m. That window is Thrare Contracting's own scheduling policy, modeled on section 26-116 of the Alpharetta Code of Ordinances rather than required by it: 26-116(3) governs "construction and demolition activity", 26-116(2) governs commercial or industrial power tools "used for landscaping and yard maintenance", and neither paragraph names pressure washing. Both bracket the same hours, and a code officer may read exterior cleaning under either, so working inside the window removes the argument. Section 26-114 sets the sound limits: 60 dBA daytime and 55 dBA overnight at a residential receiving property line, and 55 dBA daytime and 45 dBA overnight inside a multifamily dwelling. Those limits govern a daytime machine unless the work is classed under 26-116(2), which lifts them for commercial landscaping and yard maintenance equipment outside the restricted hours; overnight work has to meet them either way.

**What pressure is safe on fiber cement siding at an Alpharetta apartment community?**

James Hardie publishes the limit for its own fiber cement products. Technical Bulletin #20 directs that a pressure washer be used with wide fan tips kept a minimum of 6 feet from the wall and at pressures under 1500 psi, and states that low pressure water spray with a soft nonmetal bristle brush is most suitable. Brick veneer is governed by a different and lower number: the Brick Industry Association caps brick at 400 psi measured at the nozzle tip.

**What pressure is safe on a paver courtyard at an Alpharetta community?**

The Concrete Masonry and Hardscapes Association, in PAV-TEC-005-22, puts high pressure cleaning of interlocking concrete pavement between 1,000 and 4,000 psi at 2 to 6 gallons per minute, and efflorescence cleaner at 30 to 100 psi by low pressure pump spray. The technique matters more than the number: CMHA calls for a wide spray at a low angle of attack, because that is what stops joint sand being washed out of the joints. CMHA publishes this as a trade association standard for pavers, not as a regulation, and not as guidance for poured concrete.

**How often should an Alpharetta apartment community be pressure washed?**

Twice a year is the base cycle: a late April visit once tree pollen has finished and before the leasing peak, and a second visit in late November once hardwood leaf drop is over. Compactor pads, dumpster enclosures and breezeways come round more often than the buildings do, and a building shaded by a wooded buffer earns a tighter interval than one on the open side of the same property.

**Can an Alpharetta community association board approve exterior cleaning without an owner vote?**

Under the Georgia Property Owners' Association Act, board authority is the default and the association's own instrument controls. O.C.G.A. section 44-3-231(f) provides that the powers of the association may be exercised by the board of directors without further consent or action by the lot owners, except where the article, Title 14, the instrument, the articles of incorporation or the bylaws require otherwise. The Property Owners' Association Act governs planned communities that opted into it, and a Georgia condominium is governed by the Georgia Condominium Act instead.

**Which certifications can an Alpharetta owner or association verify for Thrare Contracting?**

Held and verifiable: DBE and ACDBE certification, MBE certification, small disadvantaged business status, E-Verify enrollment, and SAM registration under UEI Z4WKS4UE8NJ6 with CAGE code 9JAV8. Not held, and not claimed anywhere: HUBZone, 8(a) and SOC 2. The legal entity behind the Thrare Contracting name is Rare Earth Ltd.

## Sources

- [City of Alpharetta Code of Ordinances, Chapter 26 Nuisances, Article V Noise, section 26-116, Restricted uses and activities](https://library.municode.com/ga/alpharetta/codes/code_of_ordinances?nodeId=PTIICOOR_CH26NU_ARTVNO_S26-116REUSAC), on Municode. Construction and demolition hours at paragraph (3), the 250 foot commercial power tool rule at paragraph (2), and the renewable 14-day director of public safety permit. Neither paragraph names pressure washing, power washing or exterior cleaning. History shown as Code 1989, section 13-23; Ord. No. 576, section 1, 10-3-2005; Ord. No. 600, section 1, 9-5-2006; Ord. No. 824, section 1, 4-5-2021. Read 2026-09-02.
- [City of Alpharetta Code of Ordinances, Chapter 26 Nuisances, Article V Noise, section 26-114, Sound level limitations](https://library.municode.com/ga/alpharetta/codes/code_of_ordinances?nodeId=PTIICOOR_CH26NU_ARTVNO_S26-114SOLELI), on Municode. Table 1 sound level limits by receiving property, read from the expanded table, and the multifamily dwelling limits at paragraph (c). Section 26-114(a) is lifted for commercial landscaping and yard maintenance equipment outside the hours restricted by section 26-116(2), so whether it governs a daytime machine depends on how the work is classed. History shown as Code 1989, section 13-21; Ord. No. 576, section 1, 10-3-2005; Ord. No. 747, section 1, 8-28-2017. Read 2026-09-02.
- [James Hardie Building Products, Technical Bulletin #20, "Cleaning James Hardie Primed and ColorPlus Technology Siding"](https://www.jameshardiepros.com/install-and-tech-docs/browsetechdocs), November 2018, document USTB 20 version 2, TB1301 11/18. The wide fan tip, 6 foot minimum distance and under 1500 psi guidance. Read 2026-09-02 from the manufacturer bulletin as distributed in the Home Depot product document library, because the James Hardie Pros document link did not return the PDF on that date.
- [Brick Industry Association, Technical Notes on Brick Construction 20, "Cleaning Brickwork"](https://www.gobrick.com/media/file/20-cleaning-brickwork.pdf), August 2018. Used here for the 400 psi nozzle tip ceiling, the high pressure class above 800 psi, the 50 psi solution limit, the 20 square foot trial area, and the runoff containment paragraph. Read 2026-09-02.
- [Concrete Masonry and Hardscapes Association, "Cleaning, Sealing and Joint Sand Stabilization of Interlocking Concrete Pavement", PAV-TEC-005-22](https://www.cmha.org/resource/pav-tec-005/). The 1,000 to 4,000 psi and 2 to 6 gallon per minute range, the 30 to 100 psi efflorescence spray, and the wide nozzle and low angle guidance that protects joint sand. A trade association standard for pavers, not a regulation. Read 2026-08-31.
- [National Apartment Association, Apartment Turnover](https://naahq.org/sites/default/files/2025-03/01a.%20Apartment%20Turnover%202025.pdf), dated 2025-03-06, citing NAA's 2019 Survey of Operating Income and Expenses in Rental Housing Communities. Used here for the 46.8 percent turnover rate, the $1,800 move-out cost, and the figure above $168,000 a year at 200 units. Read 2026-09-02.
- [O.C.G.A. section 44-3-231, Powers and duties of association, Georgia Property Owners' Association Act](https://law.justia.com/codes/georgia/title-44/chapter-3/article-6/section-44-3-231/), 2025 Code of Georgia. Board authority at paragraph (f) and the power to retain agents at paragraph (a)(1). Read 2026-09-02.
- [Fannie Mae Selling Guide, B4-2.2-01, Full Review Process](https://selling-guide.fanniemae.com/sel/b4-2.2-02/full-review-process), effective 2026-08-05. The 10 percent replacement reserve test against the project budget, and the elements a reserve study must address. A lender eligibility rule, not a Georgia statute. Read 2026-09-02.
- [Foundation for Community Association Research, 2025 U.S. National and State Statistical Review](https://foundation.caionline.org/wp-content/uploads/2026/03/2025StatisticalReviewFoundation.pdf), published March 2026. Georgia at 11,400 community associations, 889,000 units, 2,326,000 residents, and the 30 to 40 percent self managed estimate. The Foundation describes these as curated estimates. Read 2026-09-02.
- [Georgia State Board of Workers' Compensation, Employer Information](https://sbwc.georgia.gov/employer-information). The three or more employee coverage threshold. Read 2026-09-02.
- [40 CFR 122.26, Storm water discharges](https://www.law.cornell.edu/cfr/text/40/122.26), via the Cornell Legal Information Institute. Used here for the definition of an illicit discharge at paragraph (b)(2). Read 2026-08-31.
- [Georgia Environmental Protection Division, Watershed Protection Branch, Stormwater](https://epd.georgia.gov/watershed-protection-branch/stormwater). Administration of the NPDES stormwater program in Georgia. Read 2026-08-31.
- [NOAA National Centers for Environmental Information, U.S. Monthly Climate Normals 1991-2020](https://www.ncei.noaa.gov/access/us-climate-normals/). Twelve monthly precipitation normals summed: USC00092408 Cumming 2N 56.37 inches, USC00096407 Norcross 56.32 inches, USW00013874 Atlanta Hartsfield-Jackson 50.43 inches. The separately published annual normals for the same three stations are 54.11, 54.73 and 49.71 inches, so the relationship between the stations holds either way. NOAA publishes no 1991-2020 normal for Alpharetta 4 SSW. Read 2026-09-02.

## Request an apartment pressure washing proposal for an Alpharetta community

Send the building count, the units in each and the cladding by elevation, or just the site plan. Alpharetta and North Fulton are served from the Atlanta, GA 30350 office.

[Call (678) 748-3578](tel:+16787483578) [Email Us](mailto:admin@thrarecontracting.com)
